Preventive Maintenance MVD "Hitachi" at Sugar Factory

Last updated: 2 May 2025
792 Views

Preventive Maintenance MV Drives "Hitachi"

Detail as :

Panel Housing (Power Cell and Tr. Panel).
- Visual inspection check.
- Cleaning housing (inner/Outer).
- Cleaning or Changing the dust filters.
- Preparation submits service data report and photography report

MV. Dry Type Transformer.
- Visual inspection check.
- Cleaning housing (inner/Outer).
- Recheck connection point (Power/Control)
- Insulation Resistance Test (IR).
- Polarization Index Test (PI).
- Preparation submits service data report and photography report


Power Cell Modules.
- Visual inspection check.
- Cleaning housing (inner/Outer).
- Recheck connection point (Power/Control)
- Messurement SCR , IGBT and Power Semi Fuse value.
- Preparation submits service data report and photography report
CT, PT and Groung cable loop.
- Visual inspection check.
- Recheck connection points.
- Recheck necessories components in loop.
- Some changing cable terminal format.
- Preparation submits service data report and photography report
History Recording.
- Recheck by M-Tool program.


Related Content
Medium Voltage Switchgear Panel 22kV
Medium Voltage Switchgear Panel 22kV - SIEMENS SIMOPRIME A4 22kV for Paper Industry
เว็บไซต์นี้มีการใช้งานคุกกี้ เพื่อเพิ่มประสิทธิภาพและประสบการณ์ที่ดีในการใช้งานเว็บไซต์ของท่าน ท่านสามารถอ่านรายละเอียดเพิ่มเติมได้ที่ นโยบายความเป็นส่วนตัว and นโยบายคุกกี้
Compare product
0/4
Remove all
Compare
Powered By MakeWebEasy Logo MakeWebEasy